The project is located on the East coast of Iceland, next to an existing harbour. It will be connected to an existing transmission line that will be connected to a wind farm site.
The project comprises 350 MW onshore wind, that supplies a 250 MW electrolyser expected to produce ~ 200,000 tonnes of green ammonia annually.